
Tiered Plant Stand Materials List
Lumber to be pressure treated Southern Pine
6 2×2 @ 6’-0”, or 5 2×2 @ 8’-0” cut to:
- 4 @ 4’-0” LEGS
- 1 @ 4-1/2 NAILER
- sized-to-fit shelf EDGING
1 2×6 cut to: 1 @ 5-1/2 FINIAL BASE
1 2X8 cut to: 1 @ 6” FINIAL
3’X4’X1/2” exterior cdx plywood cut to:
- 1 @ 2’-0”X2’-0” BOTTOM SHELF
- 1 @ 1’-5”X1’-5” MIDDLE SHELF
- 1 @ 10”X10” TOP SHELF
1/4” wood dowel cut to: 1 @ 5”min. FINIAL MOUNT
1 tube waterproof construction ADHESIVE
4d 2-1/2” hot-dipped galvanized or stainless steel decking SCREWS (as needed)
4d 1-1/4” hot-dipped galvanized or stainless steel finishing NAILS (as needed)

Tiered Plant Stand Instructions
- Cut off corners of shelves leaving 5-1/2” long edges. Drill weep holes in center of shelves.

- Cut3/4” X1/2” rabbets in shelf edging, then cut to lengths to fit around all shelf edges, mitering the corners. Run bead of adhesive in rabbet and toenail edging to shelves.
- Cut notches in legs to fit shelves. Glue and screw shelves to legs.
- Cut leg tops at a +/- 19′ angle to fit snug to the nailer. Glue and screw legs to nailer. Cut leg bottoms flat to the ground. The legs should be +/- 3’-10-1/2” long.
- Router and chisel center of finial base to make a 1-1/2”x1-1/2” square X 3/4” deep mortise. Glue finial base onto top of nailer.
- Drill a 1/4” diameter hole through finial base into nailer. Glue dowel into this hole.
- Drill a 1/4” diameter hole through square stock of finial then jigsaw out the Atlas Moth using full scale pattern printed on this page. Glue finial onto dowel.
Popularity: 5% [?]















Be The First To Comment
Related Post
Please Leave Your Comments Below